Annual Steel Processing Capacity 25.000 ton/year New Building Construction 80.000 DWT
Up to Panamax size all type of vessels.2 vessels per year.
Annual Total DWTs : 300.000DWT
Steel piping, propeller, rudder, shaft, hatch equipment, ventilation, Equipment, insulation, electric - electronic, painting - blasting, grit blast, hull equipments dry Docking, hatch manufacturing, design, project and consultancy.
Total 40.000 m2 Outdoor Area 32.500 m2 Workshop & Office 7.500 M2
| Lenght (m) | Depth (m) | Crane (ton) | |
| Quay1: | 175 | 6-8m | 200ton |
| Quay2: | 150 | 7-8m | 300ton |
| Quay3: | 85 | 4-8m | 300ton |
215 x 37 x 10,5 m Sized drydock
Plasma Cutting Machine-1 Capacity: 9000 x 28 000
Plasma Cutting Machine-2 Capacity: 9500 x 28000
3600 KVA
ISO 9001 : 2000
ISO 14001 : 2004
OHSAS 18001 : 2007
Turkish Ministry Of National Defence Facility Security Clearance Certificate
| Lenght (m) | Width (m) | Sea Extension (m) | Crane Capacity (ton) | |
| Slipway 1 | 150 | 26 | 60 | 200ton |
| Slipway 2 | 100 | 14 | 30 | 300ton |
| Dimensions | Crane Capacity | Roof | |
| 1.Production Workshop | 24m x 130m | 1x200 ton ; 4x10-40 ton | Collapsible Roof |
| 2.Blasting & Painting Workshop | 24m x 40m | 1x200 ton | Collapsible Roof |
| 3.Cutting & Bending Workshop | 24m x 60m | 2 x 10 ton | |
| 4.Pipe Manufacturing Workshop | 12m x x40m | 4 x 2 ton |